Audi IAA 2019

Audi | IAA 2019

Client | Contracting Entity: Audi AG
Planning | Implementation: Schmidhuber Brand Experience GmbH
Event Site: 68. IAA Pkw 2019, Germany

Scope metron eging GmbH:

  • Steelwork, stand construction, exhibits, architectural lighting, assembly, disassembly
  • Exhibition area: 3.100m²
  • Double-deck: 1.000m²

Special Feature:

  • 4 showcases each fitted with one car (exhibit)
  • exclusive lounge
  • SSF Lounge
  • authentic recreation of hands with a size of over 5m

Photographer: Andreas Keller Fotografie

Mercedes Benz Truck bauma 2019

Mercedes Benz Truck | bauma 2019

Client | Contracting Entity: Daimler AG
Architecture | Planning: Agentur für Marken(t)räume
Event Site: bauma 2019, Munich

Scope metron eging GmbH:

  • 2.500m² stand construction with 420m² external area
  • Assembly and Disassembly
  • Floor mainly oak parquet, as well as carpet and laminate
  • Wall construction predominantly in fabric (molton, blockout fabric and mesh fabric)
  • Sprinkler-compatible fabric covers with light bars of 9m length
  • 7m high facade
  • Incl. Electricity, lighting and network cabling

Special Feature:

  • Approx. 100lm 3D silhouette on the facade in 3-4 levels
  • Stand floor able to carry trucks with up to 18t weight
  • 4.5m high vehicle totems with 48″ touch screens
  • Planning and production in short time period

Photographer: Andreas Keller

Rolls Royce Shanghai 2019

Rolls Royce | Shanghai 2019

Client | Contracting Entity: BMW AG
Planning | Implementation: Puchner P3
Event Site: China Expo Complex Shanghai

Scope metron eging GmbH:

  • mounting the MAS supporting structure
  • delivery of various conventional components
  • coordinating of the materials

Photograph: Fotodesign Kilian Bishop für BMW Group

BMW Shanghai 2019

BMW | Shanghai 2019

Client | Contracting Entity: BMW AG
Planning | Implementation: Meiré und Meiré GmbH & Co. KG
Project Management: Conex GmbH
Event Site: China Expo Complex Shanghai

Scope metron eging GmbH:

  • Assembly /dissasembly
  • conventional stand construction
  • logistics
  • steelworks
  • exhibits
  • Ground area 3,650 m²
  • Upper Area 400 m²

Special Feature:

  • major logistics challenge
  • coordination of the materials from the locations in Germany and China
  • efficient use of existing stock

Photograph: Fotodesign Kilian Bishop für BMW Group

MINI | Shanghai 2019

MINI | Shanghai 2019

Client | Contracting Entity: BMW AG
Planning | Implementation: Meiré und Meiré GmbH & Co. KG
Project Management: Conex GmbH
Event Site: China Expo Complex Shanghai

Scope metron eging GmbH:

  • Assembly / dissasembly
  • conventional stand construction
  • logistics
  • steelworks
  • Ground area: 986m², Upper Area 150m²

Special Feature:

  • major logistic challenge
  • coordination of the materials form the locations in Germany and China
  • suspended facade made of steel
  • aluminium and polycarbonate
  • elaborate decoration

Photograph: Fotodesign Kilian Bishop für BMW Group

Grohe ISH 2019

Grohe | ISH 2019

Client | Contracting Entity: Grohe AG
Architecture | Concept: D’art Design Gruppe / Grohe Design Team
Event Site: ISH 2019, Germany

Scope metron eging GmbH:

  • Detail Planning
  • Implementation | Production
  • Assembly and disassembly

Special features:

  • 1500m² floor space
  • Reconstruction of 400m² ancillary rooms for press and board
  • Construction of 700m² VOP area
  • Installation of over 100 different materials / surfaces
  • 93 water connections for sinks, showers and toilets
  • 16 chrome balls with diameters up to 1.9m
  • 500 lm LED

Pictures: Ken Schluchtmann / diephotodesigner.com

New trainees 2016

Metron eging welcomes new trainees 2016

The beginning of September 2016 metron eging GmH has welcomed four new trainees and currently employs a total of fifteen young professionals.
Within the next few years our trainees will complete their apprenticeship in the field: construction mechanic, warehouse logistics specialist, electronics technician for industrial systems.
Metron eging hosted a welcome day for all trainees at the Kletterwald Waldkirchen.
We wish them the best of luck for their future careers.

New trainees 2015

Metron eging welcomes new trainees 2015

The beginning of September 2015 metron eging GmH has welcomed five new trainees and currently employs a total of seventeen young professionals.
Within the next few years our trainees will complete their apprenticeship in the field: cutting machine operator, construction mechanic and product designer.
Metron eging hosted a welcome day for all trainees at the Kletterwald Waldkirchen.

We wish them the best of luck for their future careers.