BMW Welt MINI

BMW | BMW Welt MINI

Client: BMW | MINI
Planning | Implementation: bfm | becc
Event Site: BMW World Munich, Germany

Scope metron eging GmbH:

  • Execution planning | Manufacturing planning
  • Manufacturing and Mounting on site

Enlargement of the MINI and MINI Shop Area:

  • Steelwork elements, floor and wall enlargement with
    different kinds of material
  • Furniture and exhibit construction
  • Integration of media technology and illumination elements

© BMW AG

BSH – Brand Shop Hamburg

BSH Brand Shop Hamburg

Client: BSH | Bosch Siemens Haushaltsgeräte
Concept, Architecture, General Contractor: SCHMIDHUBER
Event Site: Hohe Bleichen, Hamburg

Scope metron eging GmbH:

  • Window Display
  • 3D Wall Elements

Audi quattro Bar

Interior Construction Audi quattro Bar

Client: Audi AG, Ingolstadt
Architecture | Planning: Schmidhuber + Partner, Res Schmid RSC BauConsult
Event Site: St. Moritz, Switzerland

Scope metron eging GmbH:

  • Interior Construction made of:
    • Stone Wall and Stone Counter
    • Illuminated Quattro-Lettering with Papercutting Method
    • Surfacing Work, Light and Sound Technology, Open Fireplace, various Furniture Installations

Hoffmann Group Showroom

Showroom Odelzhausen 2014

Client: Schmidhuber, Munich
Architecture | Concept: Schmidhuber+Partner, Schmidhuber+Kaindl
Event Site: Showroom Odelzhausen 2014, Germany

Scope metron eging GmbH:

  • Execution planning
  • Delivery and Mounting
  • Interior construction (stage construction incl. floor covering, dry construction, benches, glass wall, logos)
  • Exhibits (information pillar, multimedia tables, suspended mobile, sample material wall)

Photographer: Olaf Becker, Munich/Frankfurt

The Hoffmann Group, Europe’s largest branch for quality tools, celebrates its opening of a highly modern Operating Facilities Center in Bavarian Odelzhausen in May 2014. This is the headquarter from which all products, such as the private label GARANT, are dispatched and delivered to Germany, Europe and around the world. The company SCHMIDHUBER has designed and implemented a 500 sq m large ‘Experience Showroom’ within the building, in which clients, suppliers and dealers can learn about the extensive service offering and actually test the products inside a real life setting.

Audi AG glass container

Audi AG | glass container

Client | Contracting entity: Audi AG
Concept | Design | Planning | Overall management: metron eging GmbH
Test statics: WOLF INGENIEURBÜRO GmbH
Event site:

  • Garmisch Vierschanzentournee
  • Cortina Ski WM
  • Dolomiten Marathon
  • MUC Flughafen
  • Werksviertel München
  • Kitzbühel Hahnenkammrennen

Scope metron eging GmbH:

  • Detailed coordination with customer
  • Design planning
  • Workshop planning in 3D
  • Light technology
  • Electrical engineering
  • Heating and air-conditioning systems
  • Transport and assembly
  • Feature: the container is only constructed with two supporting columns, full field of view and vehicle presentation from three sides. If necessary, he container is fully air-conditioned.

BMW IAA 2019

BMW | IAA 2019 Exhibits

Client | Contracting Entity: BMW AG
Planning | Implementation: Meiré und Meiré GmbH & Co.KG
Executing partner: Mad Hat GmbH
Event Site: 68th IAA automobile 2019, Germany

Scope metron eging GmbH:

  • Feasability check
  • Coordination | Detailed Planning | Construction
  • Implementation | Production
  • Logistics | Coordination of the different trades
  • Assemly | Disassembly
  • Exhibit BMW Fuel Cell
  • Exhibit BMW Security (Safety door, B-pillar, Safety tyres)
  • Exhibit BMW M Next
  • Exhibit BMW MyLife
  • Exhibit BMW MyCar
  • Exhibit BMW MyJourney
  • Exhibit BMW MyBMW

Audi Federal Garden Show 2019

Audi | h-tron Powertain

Client | Contracting Entity: Audi AG
Planning | Implementation: metron eging GmbH
First Use: Bundesgartenschau Heilbronn 2019

Sope metron eging GmbH:

  • Construction of the platform
  • Construction of the elevation
  • Working over and treatment of the exposed vehicle parts
  • Installing drive of parts the parts in motion

Telekom MWC 2019

Telekom | MWC 2019

Client: Deutsche Telekom AG
Planning | Implementation: Elastique GmbH, Meiré und Meiré
Event Site: MWC 2019 – Fira de Barcelona, Gran Via

Scope metron eging GmbH:

  • Campus exhibits
  • Smart City App exhibits
  • Smart Building exhibits
  • 5 G Automotive exhibits

BMW | Mondial de l‘Automobile Paris 2018

BMW | Mondial de l‘Automobile Paris 2018

Client | Contracting Entity: BMW AG
Execution Partner: Mad Hat GmbH
Planning | Implentation: Yellow Design
Event Site: Mondial de l‘Automobile Paris 2018, France

Scope metron eging GmbH:

  • Detailed Planning
  • Implementation | Production
  • Delivery and transport planning
  • Installation on Site
  • Implemented exhibits: BMW i-/CD Presenter-Dualstation, BMW Copilot, BMW i Magic Waterfall

Audi Auto Beijing 2018

Audi | Auto Beijing 2018

Client | Contracting Enitiy: AUDI AG
Planning | Implementation: Oettle Ferber Associates GmbH
Event Site: China Int. Exhibition Center Shunyi New Hall (NCIEC)

Scope metron eging GmbH:

  • Detailed Planning
  • Implementation | Production
  • Installation on Site