Audi quattro adventure

Audi | quattro adventure

Client: Audi AG, Ingolstadt
Planning| Implementation: PLANWERKSTATT GmbH
Event Site: 3 Locations

Scope metron eging GmbH:

  • Planning and Production
  • Mounting and Dismantling
  • Interior Construction of Mining and Salt Tunnel
  • Special Feature: Insertion of joinery and an old diesel locomotive into the mine by means of a supply shaft (650m below ground)

3 Locations:

  • Hotel Kempinski Berchtesgaden
  • Salt Mine Berchtesgarden
  • ÖAMTC Circuit Saalfelden

Audi AG | TT Roadster Mallorca

Audi | TT Roadster Mallorca

Client: Audi AG Ingolstadt
Planning | Implementation: designcompany
Event Site:Mallorca

Scopemetron eging GmbH:

  • Construction
  • Interior | Exterior construction
  • Furniture construction
  • Mounting and Dismounting

3 Locations:

  • Extension Finca
    Platform, Furniture, Showroom, Dinner
  • Airport Terminal
    Workshops, car wash, car upgrade
  • Airport Lounge
    Briefing Lounge, Furniture

Audi Quattro Cup Mexico 2015

Audi | Quattro Cup Mexico 2015

Client: AUDI AG
Planning | Implementation: Oettle Ferber Associates GmbH
Event Site: Baja California, Mexico

Scope metron eging GmbH:

  • Stand construction
  • Swimming platform
  • Mounting and Dismounting

MAN Forum Lounge

MAN | MAN Forum Lounge

Client | Contracting Entity: MAN Truck & Bus AG
Architecture | Concept: Schmidhuber Brand Experience GmbH
Event Site: MAN Truck & Bus AG Munich, Germany

Scope metron eging GmbH:

  • Detailed coordination with customer and architect
  • Workshop planning in 3D
  • Wall porch
  • Raised platform
  • 3D labels
  • Media technology
  • Lighting technology
  • Electrical engineering
  • Audio technology
  • Transport and assembly

BMW Welt Junior Campus

BMW AG | BMW Welt Junior Campus

Client | Contracting Entity: BMW AG
Implementation: Oettle Ferber Associates GmbH
Event Site: BMW Welt Munich, Germany

Scope metron eging GmbH:

  • Installation acoustic ceiling
  • Installation air conditioning system
  • Implementation of the room lighting concept
  • Implementation of the complete wall construction
  • Implementation of the piping system
  • Implementation of the flooring work with marquetry as well as floor graphics
  • Installation of media technology
  • Other furniture and exhibition construction
  • Electrical and network planning including implementation

© BMW AG

BMW Museum

BMW AG | BMW Museum

Client | Contracting Entity: BMW AG
Architecture | Concept: bfm-net GmbH
Event Site: BMW Museum Munich, Germany

Scope metron eging GmbH:

  • General contractor
  • Execution- / workshop planning
  • Floor and wall coverings
  • Glass cabinet for exhibits
  • Manufacturing of mounts for exhibits
  • Installation exhibits
  • Exhibition base for aircraft engine including assembly
  • Light control with app connection
  • Lighting technology including installation
  • Electrical engineering
  • Media technology
  • Graphic design and print
  • Transport and assembly

© BMW AG

BMW Brand Space – Brand and Customer Institute

BMW Group | BMW Brand Space – Brand and Customer Institute

Client | Contracting Entity: BMW AG
Architecture | Concept: yellow design GmbH
Construction planning: bfm-net GmbH
Event Site: BMW Welt Munich, Germany

Scope metron eging GmbH:

  • Execution-/workshop planning
  • Interior constructoin
  • Custom-made suspended ceiling installation including LED lighting technology
  • Furniture and exhibits construction
  • Electrical engineering
  • Light technology
  • Production, delivery and assembly

Audi Sport trophy-case

Audi AG | Audi Sport trophy-case

Client | Contracting Entity: Audi AG
Architecture | Concept: Krumpholz Design Agentur
Event Site: Audi driving experience center, Neuburg a.d. Donau

Scope metron eging GmbH:

  • Glass cabinet with 4.000 kg (5.4500 x 6.400 x 540 mm)
  • Execution- / workshop planning
  • Electrical engineering
  • Light technology
  • Transport and assembly

BMW World Future Forum

BMW World | Future Forum

Client|Contracting Entity: BMW AG
Concept & Architecture: Meiré und Meiré GmbH & Co. KG
Implementation: Oettle Ferber Associates GmbH
Event Site: BMW Welt München, Deutschland
Scope metron eging GmbH:
– General contractor
– Implementation and workshop planning
– Floor construction (cavity floor and floor covering)
– Grandstand construction
– Steel ceiling structure with suspended large scale lamellae
– Electrical engineering
– Media technology
– Lighting technology
– Audio technology
– Transportation and assembly

Copyright: ® BMW AG

Siemens Healthineers Showroom Forchheim

Siemens Healthcare GmbH | Healthineers Showroom Forchheim

Client | Contracting Entity: Siemens Healthcare GmbH
Planning | Implementation: Mutabor Brandspaces GmbH
Event Site: Forchheim, Germany

Scope metron eging GmbH:

  • Execution planning
  • Delivery and Mounting
  • Interior construction (i.a. elliptical spatial structure with acoustic tarsy)
  • Customized suspended ceiling construction (Acoustic ceiling in wood finish 300 m², mineral fiber ceiling 800 m²)
  • Furniture and Exhibits
  • Welcome-Wall (19 m) & POC-Wall (12 m) made of curved corian plates for flexible assembly with exhibits
  • Brand Theatre with walls made of switchable glass and mobile partition wall
  • 3 Radiation Rooms