Audi Auto Shanghai 2019

Audi | Auto Shanghai 2019

Client | Contracting Entity: Audi AG
Planning | Implementation: Oettle Ferber Associates GmbH
Event Site: China Expo Complex Shanghai, China

Scope metron eging GmbH:

  • Steelworks, Stand Construction, Architectural Lighting, Exhibits Mounting and Dismounting
  • Ground area 3.600m²
  • Upper area 1.001m²

Special Feature:

  • ‘Highline’ = a ctawalk made of steel (61 tons) in industrial design comprising the whole exhibition area, with a lenght of approx. 150 rm and differing levels varying in height connected by stairs, providing a view of the stand from above

Kaldewei ISH 2019

Kaldewei | ISH 2019

Client | Contracting Entity: Franz Kaldewei GmbH & Co. KG
Architecture | Concept: Schmidhuber Brand Experience GmbH
Event Site: ISH 2019, Frankfurt am Main

Scope metron eging GmbH:

  • Complete detail and execution design
  • Transports & Logistics
  • Assembly /dissasembly, incl. electricity, water, air conditioning

Special features:

  • 750m² (30 x 25m)
  • Spherical ceiling construction rising to the rear (starting from the LED sphere), with double-sided Sprinkler mesh
  • Info wall witz gold spatula, special spatula and grinding technique
  • Milled gold-painted, partially round pilaster strips
  • large-format tiles (marble look) flush with the floor, formats 3000x1500x6mm
  • Exhibit “Digital Twin”, rotatable shower model, which is coupled with a screen presentation (different elements / characteristics of the shower tub are shown depending on the angle of rotation)

Grohe ISH 2019

Grohe | ISH 2019

Client | Contracting Entity: Grohe AG
Architecture | Concept: D’art Design Gruppe / Grohe Design Team
Event Site: ISH 2019, Germany

Scope metron eging GmbH:

  • Detail Planning
  • Implementation | Production
  • Assembly and disassembly

Special features:

  • 1500m² floor space
  • Reconstruction of 400m² ancillary rooms for press and board
  • Construction of 700m² VOP area
  • Installation of over 100 different materials / surfaces
  • 93 water connections for sinks, showers and toilets
  • 16 chrome balls with diameters up to 1.9m
  • 500 lm LED

Pictures: Ken Schluchtmann / diephotodesigner.com

Audi Geneva 2019

Audi | Geneva 2019

Client: Audi AG
Planning | Implementation: Schmidhuber Brand Experience GmbH
Event Site: Autosalon Genf, Schweiz

Scope metron eging GmbH:

  • Steelworks, stand construction, exhibits, assembly and disassembly
  • Ground Area 2,100m²
  • Upper Area 250m²
  • Exclusive lounge with stone-look walls, brass band and backlit glass-walled LED
  • 500m² hanging stirup construction with curved surfaces and integrated Audi Logo
  • Catering lounge with brass furniture and brass ceiling rings
    (d=2,10m)
  • Press presentation with coffee bar, neon lettering, laser show and vehicle revelations

BMW | Mondial de l’Automobile Paris 2018

BMW | Mondial de l’Automobile Paris 2018

Client | Contracting Entity: BMW AG
Planning | Implementation: Meiré und Meiré GmbH & Co. KG
Project Management: Conex GmbH
Event Site: Mondial de l’Automobile Paris 2018, France

Scope metron eging GmbH:

  • Stand Construction, Mounting and Dismantling
  • Steelworks, Stand Construction
  • Ground Area 2,014 m², Upper Area 607 m², Lamella Roof 436 m²
  • More than 160 linear meter illuminated passe-partout
  • Exhibits

Special Features:

  • Highlight platform with turntable and LED wall in building facade
  • Exhibit Waterfall

Siemens IFA 2018

Siemens | IFA 2018

Client | Contracting Entity: BSH | Bosch Siemens Haushaltsgeräte
Architecture | Concept: Schmidhuber Integrated Services GmbH
Concept | Communication: Schmidhuber Integrated Services GmbH, KMS BLACKSPACE GmbH
Event Site: IFA Berlin 2018, Germany

Scope metron eging GmbH:

  • Steelworks and Exhibits including Mounting | Dismounting
  • Ground area: 3.123 m²
  • Upper area: 500 m²
  • Exhibition area: 2.100 m²
  • Concept I Communication: Connected City – replication of a modern city setting with graphic surfaces, city façade-elements and highlight shop windows.
    Home Connect Area – hinged LED grid with blue illumination for room separation.

MINI Auto Beijing 2018

MINI | Auto Beijing 2018

Client | Contracting Entity: BMW AG
Planning | Implementation: Conex GmbH
Event Site: China Int. Exhibition Center Shunyi New Hall (NCIEC)

Scope metron eging GmbH:

  • Steelworks, Stand Construction, Mounting and Dismantling
  • Use of inventory exhibits
  • Ground area 310 m²

Photoquelle / Photo Credits by BMW AG

BMW | Auto Beijing 2018

BMW | Auto Beijing 2018

Client | Contracting Entity: BMW AG
Planning | Implementation: Conex GmbH
Event Site: China Int. Exhibition Center Shunyi New Hall (NCIEC)

Scope metron eging GmbH:

  • Steelworks, Stand Construction, Mounting and Dismantling
  • Use of inventory exhibits
  • Ground area 1,550 m²
  • Upper Area 320 m²

Photoquelle / Photo Credits by BMW AG

Audi Auto Beijing 2018

Audi | Auto Beijing 2018

Client | Contracting Entity: AUDI AG
Planning | Implementation: Oettle Ferber Associates GmbH
Event Site: China Int. Exhibition Center Shunyi New Hall (NCIEC)

Scope metron eging GmbH:

  • Steelworks, Stand Construction, Architectural Lighting, Mounting and Dismantling
  • Use of inventory exhibits
  • Ground area 1.200 m²
  • Upper Area 360 m²

Special Feature:

  • Audi Cloud
  • 7 day assembly time

Telekom AG | conhIT Berlin 2018

Telekom AG | conhIT Berlin 2018

Client | Contracting Entity: Deutsche Telekom AG, Brand Marketing
Planning | Implementation: Meire & Meire
Event Site: conhIT Berlin

Scope metron eging GmbH:

  • Stand Construction, Mounting and Dismantling
  • Implementation planning
  • Projectmanagement
  • Ground area 2750 m²
  • Upper Area 100 m²