VIEGA Seewalchen Remodeling of the Training Building 2020

VIEGA Seewalchen Remodeling of the Training Building 2020

Client | Contracting Entity: Viega GmbH & Co. KG
Planning | Implementation: Atelier Markgraph GmbH
Event Site: Attersee

Scope metron eging GmbH:

  • Manufacturing / Implementation of exhibition exhibits, lighting, bathrooms
  • New construction of a seminar center for further education and training of user customers.

Special features:

  • Exhibition area on 2 levels, approx. 600m²
  • Presentation of all Viega products
  • Individual bathroom designs
  • Assembly of stand construction elements, exhibits and installations
  • Installation of approx. 2700 Viega products

Photography: © Chris Gerster

BMW European Championships 2022

BMW European Championships 2022

Client: BMW AG
Architecture | Implementation:
Conex GmbH | Meiré&Meiré
Event Site: BMW Welt München

Scope metron eging GmbH:

  • Steel construction
  • catwalk on the roof
  • staircases
  • lighting
  • railings
  • timing furniture

Special Features:

  • Elevated catwalk incl. lighting on existing roof construction
  • Timing furniture incl. photo system for the participants
  • Slide & catwalk lighting incl. control and integration into the building operation system

Photographer: Sandra Sommerkamp, Performance Photography | Sandra Sommerkamp | Deutschland

Bosch IFA 2022

Bosch IFA 2022

Client: BSH Bosch und Siemens Hausgeräte GmbH
Planning | Implementation: Schmidhuber Brand Experience GmbH
Event Site: IFA Berlin

Scope metron eging GmbH:

  • Detail and execution planning
  • Production/Implementation stand construction, exhibits, furniture, graphics, planting, decorative elements
  • Assembly, Disassembly, Logistics
  • Exhibit area 2,200m², Height 5m

Special features:

  • Press event with the music group “Die Fantastischen Vier“
  • Many different individual areas

Photographer: Jörg Hempel Fotografie

Siemens IFA 2022

Siemens IFA 2022

Client: Siemens Hausgeräte
Planning | Implementation: Schmidhuber Brand Expirience
Event Site: IFA Berlin

Scope metron eging GmbH:

  • Steel construction, stand construction, exhibits, assembly & disassembly
  • Detail and execution planning
  • Exhibit area: 3,348 m²
  • Double-deck: 467 m²

Special features:

  • Park-like design with flowerbeds and planting
  • Home Connect house installation

Photographer: Jörg Hempel Fotografie