Complete Bathroom Solutions Grohe ISH 2015

Complete Bathroom Solutions

Client: Grohe AG
Architecture | Planning: Schmidhuber + Partner, Munich
Event Site: ISH 2015, Messe Frankfurt a. Main

Scope metron eging GmbH:

  • Detailed Planning
  • Implementation | Production
  • Installation on Site
  • Special Feature:
    controllable water curtain system
    Staging of armatures to a kinetic animation by a software protected system made of servo motors.
    freely suspended supporting structure made of steel and aluminum

Siemens IFA 2014

Blown Up Cup | Coffee Wall

Client: BSH | Bosch Siemens Haushaltsgeräte
Planning | Implementation: Schmidhuber + Partner, Munich
Event Site: IFA Berlin 2014

Scope metron eging GmbH:

  • Detailed Planning
  • Implementation | Production
  • Installation on Site

AUFI Table

AUFI Table

Client: Audi AG, Ingolstadt
Planning | Implementation: madhat GmbH (Media), Höweler+Yoon (Architecture), Stylepark (Kuration)
Event Site: CES Las Vegas 2014

Scope metron eging GmbH:

  • Detailed Planning
  • Implementation | Production
  • Installation on Site

AUDI Original Accessories

AOZ Wall – Audi Original Accessories

Client: Audi AG, Ingolstadt
Planning | Implementation: Schmidhuber und Partner
Event Site: ATC CLT Airport Munich 2015, Auto Salon Geneva 2015

Scope metron eging GmbH:

  • Detailed Planning
  • Implementation | Production
  • Installation on Site

Nikon Europe Interactive Heart

Nikon Interactive Heart

Client: madhat GmbH
Planning | Implementation: madhat GmbH, Jung v. Matt
Event Site: Photokina Cologne 2012, Germany

Scope metron eging GmbH:

  • Implementation | Manufacturing
  • Mounting

Nikon Heart of Dubai

Nikon | Heart of Dubai

Client: madhat GmbH
Planning | Implementation: madhat GmbH (Gewerk Medien), Jung v. Matt (Auftraggeber / Relations)
Event Site: Dubai Mall, V.A.E.

Scope metron eging GmbH:

  • Implementation | Production
  • Installation on Site

Viessmann

Viessmann Exhibits

Client: madhat GmbH
Planning | Implementation: madhat GmbH (Media), Atelier Markgraph GmbH
Event Site: Viessmann Main Factory, Alendorf

Scope metron eging GmbH:

  • Implementation | Production
  • Fixed Installation
  • Installation on Site

Audi Tradition

Audi Tradition

Client: Audi AG, Ingolstadt
Planning | Implementation: DC Designcompany GmbH
Event Site: Family Days Audi Ingolstadt 2014

Scope metron eging GmbH:

  • Detailed Planning
  • Implementation | Production
  • Installation on Site

BMW Vehicle Platform

BMW Vehicle Platform i8, X5

Client: BMW AG
Planning | Implementation: metron eging GmbH
Event Site: Airport Frankfurt am Main

Scope metron eging GmbH:

  • Detailed Planning
  • Implementation | Production
  • Installation on Site

Audi TTS Power Train

Audi TTS Power Train

Client: Audi AG, Ingolstadt
Planning | Implementation: metron eging GmbH
Event Site: 84. International Auto Salon Geneva 2014, Switzerland

Scope metron eging GmbH:

  • Construction of the platform
  • Construction of the elevation
  • Working over and treatment of the exposed vehicle parts
  • Installing drive of the parts in motion