MINI IAA 2019

MINI | IAA 2019

Client | Contracting Entity: BMW AG
Planning| Implementation: Meiré und Meiré GmbH & Co.KG
Event Site: 68. IAA Pkw 2019, Germany

Scope metron eging GmbH:

  • Steelwork, stand construction, exhibits, assembly, disassembly
  • detail and execution planning
  • Exhibition area: 611 m²
  • Double-deck: 220 m²

Special feature:

  • Suspended pipe construction made of steel
  • Roof construction made of bent steel tubes
  • Artistically designed brick wall

BMW IAA 2019

BMW | IAA 2019

Client | Contracting Entity: BMW AG
Planning | Implementation: Meiré und Meiré GmbH & Co.KG
Event site: 68. IAA Pkw 2019, Germany

Scope metron eging GmbH:

  • Steelwork, stand construction, exhibits, assembly, disassembly
  • Detail- and execution planning
  • Exhibition area: 3.052 m²
  • Double-deck: 735 m²

special feature:

  • suspended, three-dimensional LED Curtain
  • Textile facade with mounted LED (customizable)
  • Walking NOW platform with cars on the upper floor
  • Exclusive Lounge

Audi IAA 2019

Audi | IAA 2019

Client | Contracting Entity: Audi AG
Planning | Implementation: Schmidhuber Brand Experience GmbH
Event Site: 68. IAA Pkw 2019, Germany

Scope metron eging GmbH:

  • Steelwork, stand construction, exhibits, architectural lighting, assembly, disassembly
  • Exhibition area: 3.100m²
  • Double-deck: 1.000m²

Special Feature:

  • 4 showcases each fitted with one car (exhibit)
  • exclusive lounge
  • SSF Lounge
  • authentic recreation of hands with a size of over 5m

Photographer: Andreas Keller Fotografie

Mercedes Benz Truck bauma 2019

Mercedes Benz Truck | bauma 2019

Client | Contracting Entity: Daimler AG
Architecture | Planning: Agentur für Marken(t)räume
Event Site: bauma 2019, Munich

Scope metron eging GmbH:

  • 2.500m² stand construction with 420m² external area
  • Assembly and Disassembly
  • Floor mainly oak parquet, as well as carpet and laminate
  • Wall construction predominantly in fabric (molton, blockout fabric and mesh fabric)
  • Sprinkler-compatible fabric covers with light bars of 9m length
  • 7m high facade
  • Incl. Electricity, lighting and network cabling

Special Feature:

  • Approx. 100lm 3D silhouette on the facade in 3-4 levels
  • Stand floor able to carry trucks with up to 18t weight
  • 4.5m high vehicle totems with 48″ touch screens
  • Planning and production in short time period

Photographer: Andreas Keller

Rolls Royce Shanghai 2019

Rolls Royce | Shanghai 2019

Client | Contracting Entity: BMW AG
Planning | Implementation: Puchner P3
Event Site: China Expo Complex Shanghai

Scope metron eging GmbH:

  • mounting the MAS supporting structure
  • delivery of various conventional components
  • coordinating of the materials

Photograph: Fotodesign Kilian Bishop für BMW Group

BMW Shanghai 2019

BMW | Shanghai 2019

Client | Contracting Entity: BMW AG
Planning | Implementation: Meiré und Meiré GmbH & Co. KG
Project Management: Conex GmbH
Event Site: China Expo Complex Shanghai

Scope metron eging GmbH:

  • Assembly /dissasembly
  • conventional stand construction
  • logistics
  • steelworks
  • exhibits
  • Ground area 3,650 m²
  • Upper Area 400 m²

Special Feature:

  • major logistics challenge
  • coordination of the materials from the locations in Germany and China
  • efficient use of existing stock

Photograph: Fotodesign Kilian Bishop für BMW Group

MINI | Shanghai 2019

MINI | Shanghai 2019

Client | Contracting Entity: BMW AG
Planning | Implementation: Meiré und Meiré GmbH & Co. KG
Project Management: Conex GmbH
Event Site: China Expo Complex Shanghai

Scope metron eging GmbH:

  • Assembly / dissasembly
  • conventional stand construction
  • logistics
  • steelworks
  • Ground area: 986m², Upper Area 150m²

Special Feature:

  • major logistic challenge
  • coordination of the materials form the locations in Germany and China
  • suspended facade made of steel
  • aluminium and polycarbonate
  • elaborate decoration

Photograph: Fotodesign Kilian Bishop für BMW Group

Audi Auto Shanghai 2019

Audi | Auto Shanghai 2019

Client | Contracting Entity: Audi AG
Planning | Implementation: Oettle Ferber Associates GmbH
Event Site: China Expo Complex Shanghai, China

Scope metron eging GmbH:

  • Steelworks, Stand Construction, Architectural Lighting, Exhibits Mounting and Dismounting
  • Ground area 3.600m²
  • Upper area 1.001m²

Special Feature:

  • ‘Highline’ = a ctawalk made of steel (61 tons) in industrial design comprising the whole exhibition area, with a lenght of approx. 150 rm and differing levels varying in height connected by stairs, providing a view of the stand from above

Kaldewei ISH 2019

Kaldewei | ISH 2019

Client | Contracting Entity: Franz Kaldewei GmbH & Co. KG
Architecture | Concept: Schmidhuber Brand Experience GmbH
Event Site: ISH 2019, Frankfurt am Main

Scope metron eging GmbH:

  • Complete detail and execution design
  • Transports & Logistics
  • Assembly /dissasembly, incl. electricity, water, air conditioning

Special features:

  • 750m² (30 x 25m)
  • Spherical ceiling construction rising to the rear (starting from the LED sphere), with double-sided Sprinkler mesh
  • Info wall witz gold spatula, special spatula and grinding technique
  • Milled gold-painted, partially round pilaster strips
  • large-format tiles (marble look) flush with the floor, formats 3000x1500x6mm
  • Exhibit “Digital Twin”, rotatable shower model, which is coupled with a screen presentation (different elements / characteristics of the shower tub are shown depending on the angle of rotation)

Grohe ISH 2019

Grohe | ISH 2019

Client | Contracting Entity: Grohe AG
Architecture | Concept: D’art Design Gruppe / Grohe Design Team
Event Site: ISH 2019, Germany

Scope metron eging GmbH:

  • Detail Planning
  • Implementation | Production
  • Assembly and disassembly

Special features:

  • 1500m² floor space
  • Reconstruction of 400m² ancillary rooms for press and board
  • Construction of 700m² VOP area
  • Installation of over 100 different materials / surfaces
  • 93 water connections for sinks, showers and toilets
  • 16 chrome balls with diameters up to 1.9m
  • 500 lm LED

Pictures: Ken Schluchtmann / diephotodesigner.com