Audi Exhibits Mondial de l’Automobile Paris 2016

Audi | Exhibits Mondial de l’Automobile Paris 2016

Client | Contracting Entity: AUDI AG
Planning | Implementation: Schmidhuber
Event Site: Mondial de l’Automobile Paris 2016, Frankreich

Scope metron eging GmbH:

  • Detailed Planning
  • Implementation | Production
  • Installation on Site

Audi Art Installation Audi Design

Audi | Art Installation Audi Design

Client: Audi AG, Ingolstadt
Planning | Implementation: humans since 1982, Schmidhuber + Partner GbR, MadHat GmbH
Event Site: Miami Beach, USA

Scope metron eging GmbH:

  • Detailed Planning
  • Implementation | Production
  • Installation on Site

Audi AG | Audi Works Neckarsulm

Logistic-Exhibits | Audi AG

Client: Mad Hat GmbH
Planning | Implementation: Mad Hat, metron eging
Event Site: Audi Werk Neckarsulm

Scope metron eging GmbH:

  • Co-Development of Body and Add-on Parts
  • Production Planning
  • Production
  • Installation on Site

Jaguar Airport

Jaguar | XE “Airport” 2015

Client: Jaguar
Planning | Implementation: Zibert + Friends, Munich
Event  Site: Airport Madrid | Vienna | Amsterdam | Rome | Frankfurt

Scope metron eging GmbH:

  • Detailed Planning
  • Saftey Technology
  • Production of the total stand system incl. movable units and their controlling (5 Set’s)
  • Logistics Planning
  • Mounting and Dismantling at all Sites

Siemens IFA 2015 Exhibits

Siemens | IFA 2015 Exhibits

Client: BSH | Bosch Siemens Haushaltsgeräte
Concept, Architecture, General Contractor: SCHMIDHUBER
Event Site: IFA Berlin 2015

Scope metron eging GmbH:

  • Construction and Detail Planning
  • Implementation | Production
  • Prototyping
  • Installation on Site

Complete Bathroom Solutions Grohe ISH 2015

Complete Bathroom Solutions

Client: Grohe AG
Architecture | Planning: Schmidhuber + Partner, Munich
Event Site: ISH 2015, Messe Frankfurt a. Main

Scope metron eging GmbH:

  • Detailed Planning
  • Implementation | Production
  • Installation on Site
  • Special Feature:
    controllable water curtain system
    Staging of armatures to a kinetic animation by a software protected system made of servo motors.
    freely suspended supporting structure made of steel and aluminum

Siemens IFA 2014

Blown Up Cup | Coffee Wall

Client: BSH | Bosch Siemens Haushaltsgeräte
Planning | Implementation: Schmidhuber + Partner, Munich
Event Site: IFA Berlin 2014

Scope metron eging GmbH:

  • Detailed Planning
  • Implementation | Production
  • Installation on Site

AUFI Table

AUFI Table

Client: Audi AG, Ingolstadt
Planning | Implementation: madhat GmbH (Media), Höweler+Yoon (Architecture), Stylepark (Kuration)
Event Site: CES Las Vegas 2014

Scope metron eging GmbH:

  • Detailed Planning
  • Implementation | Production
  • Installation on Site

AUDI Original Accessories

AOZ Wall – Audi Original Accessories

Client: Audi AG, Ingolstadt
Planning | Implementation: Schmidhuber und Partner
Event Site: ATC CLT Airport Munich 2015, Auto Salon Geneva 2015

Scope metron eging GmbH:

  • Detailed Planning
  • Implementation | Production
  • Installation on Site

Nikon Europe Interactive Heart

Nikon Interactive Heart

Client: madhat GmbH
Planning | Implementation: madhat GmbH, Jung v. Matt
Event Site: Photokina Cologne 2012, Germany

Scope metron eging GmbH:

  • Implementation | Manufacturing
  • Mounting