AUDI 150 years NSU exhibition 2023

AUDI 150 years NSU exhibition 2023

Client | Contracting Entity: AUDI AG
Planning | Implementation: NEON PartmbH
Event Site: AUDI Forum NSU, Ingolstadt

Scope metron eging GmbH:

  • factory / assembly planning
  • detailed construction
  • production
  • graphic work
  • assembly and commissioning on site

BMW Museum | Exhibition 100 Years of Motorcycles

BMW Museum | Exhibition 100 Years of Motorcycles

Client | Contracting Entity: BMW Group     
Planning | Concept | Implementation: MUTABOR Brand Experience GmbH
Event Site: BMW-Museum, Munich

Scope metron eging GmbH:

  • Factory / assembly planning
  • furniture construction
  • exhibit construction
  • graphic works
  • interior construction
  • Disassembly of the existing exhibition
  • Assemply of the new exhibition

Special features:

  • Work in inaccesssible places (air space)

© BMW AG

Audi Pavilion Wolfsburg

Audi Pavillon Wolfsburg

Client | Contracting Entity: AUDI AG     
Planning | Implementation: Schmidhuber Brand Experience GmbH
Event Site: Autostadt GmbH, Wolfsburg

Scope metron eging GmbH:

  • Demolition work incl. disposal
  • Carcass work
  • Fire protection measures
  • Extension incl. works planning and implementation
  • Interactive exhibits
  • Facade opening for vehicle insertion

DFB Campus Studios 1-3

DFB Campus Studios 1-3

Client | Contracting entity: DFB
Planning | Implementation: Atelier Markgraph
Event site: Frankfurt, Germany

Scope metron eging GmbH:

  • Planning
  • Manufacturing
  • Assembly
  • Flooring
  • Walls
  • Ceiling

Special features:

  • Interior fittings of 3 studios in the newly built DFB Campus
  • Studio 1 in cabin look (multifunctionally usable, table tops can for example be rotated and used as a pin board and white boards)
  • Studio 2 as playing field with training items (replicated from steel, multifunctional use, free-kick dummies with felt and whiteboard surfaces can be used both on the wall and free-standing)
  • Studio 3 as coach cabin (with number boards, graphics milled from relief and white solid-colored compact panels)

Ötztal Tourist Center 2021

Ötztal Tourist Center 2021

Client | Contracting entity: Ötztal Touristik
Planning | Implementation: AMT
Event Site: Ötztal – Tirol

Scope metron eging GmbH:

  • Wall and furniture construction

Special features:

  • Polygonal projection screen
  • Moveable stand

Audi 50 Jahre Vorsprung durch Technik

Audi 50 Jahre Vorsprung durch Technik

Client | Contracting Entity: AUDI AG
Concept and Architecture: Design Company Agentur GmbH
Event Site: Audi Forum Neckarsulm

Scope metron eging GmbH:

  • detailed construction
  • production
  • assembly and on-site commissioning

Steel construction at new building of the elementary school Munich

Steel construction at new building of the elementary school Munich

Public tender

Client | Contracting Entity: Landeshauptstadt München, Baureferat, Hochbau
Planning | Implementation: Auer Weber
Event Site: München Allach – Theodor Fischer Straße

Scope metron eging GmbH:

  • Planning period and tonnage:
  • August 2020 – Oktober 2022
  • Tonnage of steel used: 150t
  • Preparation of shop drawings for:
  • Canopies
  • Escape balconies
  • Escape staircases
  • Transformer house incl. lamella facade
  • Lamella enclosure for an escape staircase incl. roofing
  • Production, painting and assembly of:
  • approx. 800 running meters of steel escape balconies
  • approx. 520m² canopies
  • 3 external steel escape staircases
  • Transformer house incl. lamella facade
  • Lamella enclosure incl. roofing

BMW AG AMC Oberschleißheim

BMW AG AMC Oberschleißheim

Client: BMW AG
Planning | Implementation: New Order GbR / metron eging GmbH
Event Site: Mittenheimer Str. 64, 85764 Oberschleißheim

Scope metron eging GmbH:

  • organization
  • construction
  • production
  • assembly

BMW Welt Rolls Royce 2021

BMW Welt Rolls Royce 2021

Client: BMW AG
Planning | Implementation: Conex GmbH, Meiré&Meiré
Event Site: BMW Welt Munich, Germany

Scope metron eging GmbH:

  • Execution / workshop planning
  • Electrical and network planning incl. implementation
  • Ceiling & vehicle lighting
  • Installation of a new acoustic ceiling
  • Implementation of the complete wall construction
  • Implementation of the complete floor construction
  • Fabrication/Assembly/Transportation

Special features:

  • Over 100 ceiling spots recessed into the ceiling and individually controllable
  • Switchable foil to separate the Bespoke area (consulting area for customers)
  • Glass balustrades with curved panes without visible fastenings
  • 4.5m high cabinet element incl. lighting with continuous side walls

Copyright: BMW AG

Community Center Waldkirchen 2021

Community Center Waldkirchen 2021

Public tender

Client:  Bayern Tourismus Marketing GmbH
Architect | Planning:  Innenarchitekt BDIA Dipl. Ing. (FH) Thomas Honegg
Event Site: Bürgerhaus Waldkirchen

Scope metron eging GmbH:

  • Complete office remodeling with demolition / disassembly work
  • Drywall, flooring, painting, masonry and plastering works
  • Sanitary works
  • Electrical and network planning incl. implementation
  • Media technology
  • Route cladding
  • Mobile partition walls
  • Acoustic ceiling canvas
  • Pivoting media wall
  • Acoustic graphics