Siemens Mobility Inno Trans 2024
Client | Contracting entity: Siemens Mobility GmbH
Concept: Beyond Future One GmbH
Work planning | Implementation: metron eging GmbH
Event site: Inno Trans Berlin 2024
Scope metron eging GmbH:
- 1,302 m² floor space
- 562 m² double deck over 3 floors
- 86 tons of steel construction, 6 staircases
- 9 air-conditioned offices
- 3 integrated catering kitchens
- 41 outward transports of material
Special features:
- 8 days of assembly work
- day and night shifts
Photo credit: © stefan-zeitz.de